Before construction of the 75,900 square-foot training center could occur on the infill site, demolition of an existing structure was completed. The new training center consists of two high bay areas that include a welding shop, maintenance shop, and 2 gravel pits. Throughout the building there are 9 classrooms, 9 instructor’s rooms, an auditorium, 3 conference rooms, a computer lab, a lunchroom, and a kitchen. The facility also includes 5 drive-in doors with a clear height of 33 feet. The 24-acre site provides 197 parking stalls. A 7,000 square-foot Green Roof is located over the office area.