The team worked through a fast paced 3-month schedule. the scope included the distribution build-out with 36 exterior docks and an 8,000-square-foot office area.
The team worked through a fast paced 3-month schedule. the scope included the distribution build-out with 36 exterior docks and an 8,000-square-foot office area.