The project for Trammell Crow Company consists of developing a 52-acre site and building a 788,000-SF speculative precast warehouse with 3,500-20,000 SF of future office space. The site work will consist of typical site utilities and a storm drain system with five retention basins. Site paving will be asphalt for the car parking and drive lanes with concrete paving at the loading dock aprons and dolly pads. The warehouse will have four drive-in doors with 80 loading docks day-one and 80 future loading docks. Curtain wall glazing systems will be at the office corners and a Rhino Bond roofing system with six MAU’s and 12 exhaust fans interlocked with the building louvers.